How It Really Worksengineeringgreat lakesshipping
Soo Locks: The 21-Foot Step That Connects Lake Superior, Michigan
At Sault Ste. Marie, ships rise and fall 21 feet between Lakes Superior and Huron, and 88% of U.S. domestic iron ore shipping depends on one lock.
Every claim sourced
17 claims · 17 sources
0 disagreements logged
0 editorial corrections
Last checked Oct 2, 2026

The story
The numbered claim log below connects facts in this story to their sources.
Lake Superior is the highest of the Great Lakes, and it has only one outlet: the St. Marys River. Where the river leaves the lake at Sault Ste. Marie, it drops about 21 feet over three-quarters of a mile of rapids and hard sandstone. For centuries, that drop was a wall. Boats could not go up or down it. Cargo had to be unloaded, carried around the rapids, and loaded onto other boats. In the 1840s, copper and iron ore were discovered in Michigan's Upper Peninsula, and suddenly that wall mattered. Some in Congress thought a canal at such a remote place was absurd. One senator compared it to building a canal on the moon. But in 1853 the State of Michigan went ahead. Crews working in brutal conditions cut through solid rock, and in 1855 the first locks opened: two chambers in tandem, each 350 feet long, at a cost nearly three times the estimate. In June 1855, the first steamer passed through, and for the first time ships could sail freely between Lake Superior and the lower lakes. In 1881, the federal government took over, and the U.S. Army Corps of Engineers has run the locks ever since. Passage has always been free. As ships grew, the locks grew with them. The MacArthur Lock opened in 1943, and it's 800 feet long. The Poe Lock, first built in 1896, was rebuilt and reopened in 1968 at 1,200 feet long and 110 feet wide. It's the only lock at the Soo big enough for the 1,000-foot freighters that carry iron ore across the lakes. Each time the Poe fills or drains to raise or lower a ship those 21 feet, it moves up to 22 million gallons of water, using nothing but valves and gravity. That makes the Poe a single point of failure for American industry. According to the Army Corps of Engineers, 88% of all U.S. domestic iron ore shipping depends on it. If it were shut down, much of the Great Lakes fleet would be stuck. So a second lock the same size is being built. Construction began in 2019 on the site of two old, outdated locks. The project is estimated at $3.2 billion and is on schedule for completion in 2030. The Soo Locks were designated a National Historic Landmark in 1966, and they're still one of the busiest working waterways in the country.
Last corrected: no editorial corrections on this page yet.
Grew up near here?
Get the free Michigan guide: every Hidden Current place in the region, with what you can still see and how to get there.
State guides are coming soon. Email signup is not available yet.
Watch the short documentary
Soo Locks: The 21-Foot Step That Connects Lake Superior, Michigan
Claim log
| # | Claim | Sources | Status |
|---|---|---|---|
| 1 | The Soo Locks are at 46°30′12″N 84°21′00″W; they became an NHL in 1966; they close in winter |
| Sourced |
| 2 | The river drops 21 feet over three-quarters of a mile of rapids and sandstone |
| Sourced |
| 3 | Copper and iron were discovered in the 1840s |
| Sourced |
| 4 | One senator compared the canal to building one on the moon |
| Sourced |
| 5 | Construction began in 1853 |
| Sourced |
| 6 | The 1855 State Lock had two 350-ft chambers and cost three times the estimate |
| Sourced |
| 7 | The locks were transferred to the Army in 1881 and are toll-free |
| Sourced |
| 8 | The MacArthur Lock opened in 1943 at 800 ft; the Poe Lock opened in 1968 at 1,200 × 110 × 32 ft |
| Sourced |
| 9 | The Poe Lock was first built in 1896 |
| Sourced |
| 10 | The Poe is the only lock for 1,000-foot freighters |
| Sourced |
| 11 | Each cycle moves 22 million gallons |
| Sourced |
| 12 | 88% of U.S. domestic iron ore shipping depends on the Poe; the new lock costs $3.219B and is on schedule for 2030 |
| Sourced |
| 13 | 88% of U.S. domestic iron ore shipping depends on the Poe; the new lock costs $3.219B and is on schedule for 2030 |
| Sourced |
| 14 | Construction of the new lock began in 2019 |
| Sourced |
| 15 | The new lock replaces the Davis and Sabin locks |
| Sourced |
| 16 | The park is open year-round with a free platform; the visitor center is open May–October |
| Sourced |
| 17 | Engineers Day is the last Friday in June |
| Sourced |
Disagreements logged
No approved disagreements are logged on this page yet.
Submit a disagreement
Disagree with a fact in this story? Submit a source-backed note for editorial review. It stays private until approved and does not automatically become a correction.
Sources
- Wikipedia
- Northern Michigan History
- Mystic Stamp
- Adventures in Northern Michigan
- Michigan State University
- American Great Lakes Ports Association
- Mid City SSM
- Chris Izworski
- UP Travel
- WLUC-TV
- U.S. Army Corps of Engineers
- Awesome Mitten